 
	Pedestrian Bridge
The footbridge connects two raised plateaus of a new park on the site of the former KRUPP steelworks. The 100 metre-long bridge forms the final part of a circular path within the West inner-city park, and in conjunction with the Canyon it forms the gateway to the Century Hall.
The V-shaped supports, which transfer their loads to large blocks, not only highlight the gateway aspect, but also convey the idea of crossing the valley on stilts.
The night-time illumination was developed as an interactive project together with lighting artist Achim Wollscheid. Movement sensors detect people crossing the bridge and a computer program converts this information into control impulses for the lighting, causing the light to follow people playfully as they walk across.
| Building Typology: | Transport, Infrastructure | 
|---|---|
| Location: | Bochum | 
| Country: | Germany | 
| Planning / Construction Period: | 05/1999 - 10/1999 | 
| Order type: | New Building | 
| Client: | LEG Landesentwicklungsgesellschaft NRW GmbH, Dortmund | 
| Project Participants: | 
 | 
| Scope of Services: | Architecture | 
| Awards: | Renault Traffic Design Award 2003 BDA Award for Good Buildings 2003 | 
 
		 
		 
		 
		 
		 
		 
		


